Take a Look at Our Work

901 Juanita Ln.
Full interior/exterior paint as well as wood refinishing downstairs.
Due to the rough shape of the T&G we had to sand it all down with various grits of sandpaper with our Festool sander. While it was very, very tedious and difficult the end result was beautiful and the homeowner loved it.
Property Photos
1607 N Gondola Ct
Full interior/exterior paint. New build.
By utilizing quality paints and one product/color/sheen on walls, trim and doors we are able to complete the interior and exterior of the homes for this builder in 4-5 total days on site.
Property Photos
1616 N Gondola Ct
Full interior/exterior paint. New build.
By utilizing quality paints and one product/color/sheen on walls, trim and doors we are able to complete the interior and exterior of the homes for this builder in 4-5 total days on site.
Property Photos
Spirit Lake New Build
Exterior paint for home and shop soffit/fascia.
This was a one day project for 2 man crew. Because we got ahead of schedule we decided to just do the soffit/fascia for the homeowner, even though it was not part of the estimate.
Property Photos
Riverwalk
Exterior Paint after extensive remodel.
The client was a referral from another painting company and we painted their parents home next door as well. We scheduled the two homes at the same time and completed both within 4 worked days for a 4 man crew.
Property Photos
29824 N Greystone Rd
This was one of the first large projects we took on. The project was a hang, tape, texture and interior/exterior paint (including cabinets, trim and beam finishing). Much of the upstairs was re-hung and finished, as well patches everywhere.
This job turned out wonderfully. Much to the satisfaction of the contractor and realtor. We are very proud of it.
Property Photos
2383 Sunnyside Rd
Exterior repaint and siding repair.
This home required some siding repair and significant caulking and priming of raw trim. We had to utilize a snorkel lift for the rooflines and spent the first 2 days working on only the upper sections of the building. After that was completed the job was finished in 3 days by a 4 man crew.
Property Photos
31 Deacon St
Exterior repaint. Color on color.
Every aspect of this job required attention to detail and slow moving sections. Open soffits with T&G that required oil based primer because of condition. This job was completed in 4 days for a 4 man crew.
Property Photos
The Farmhouse
Interior tape, skip trowel texture finish and prime.
This was not our drywall hang job. Pictures of those gaps were shown to give an example of how much pre-fill and inside corner bead was necessary to complete. Despite the inferior hang job the finished product still looked great and held up against cracks because of the use of plaster-based compound and inside corner bead.
Property Photos
Architerra Hope Townhomes
These 41 townhomes were completed between
2023-2024 and were around 2500sf each.
These were full interior/exterior painting packages with white millwork and doors. With the multiple phases these projects averaged 5 days for a 4 man crew to complete the entire package including touch up.
Property Photos
Property Video
Gallery not found.Architerra Marshall Meadows
These 33 Homes were completed between 2024-2025
and ranged from 1400-2700sf each.
These were full interior/exterior painting packages with white millwork and doors. With the multiple phases these projects averaged 5 days for a 4 man crew to complete the entire package including touch up.
Property Photos
Architerra High Desert
Architerra high desert development description.
Property Photos
Property Video
Gallery not found.Markham Homes 5 Mile
These 17 homes were completed between 2022-2023 and
ranged from 1600-3000sf each.
These were full interior/exterior painting packages with white millwork and doors. With the multiple phases these projects averaged 5 days for a 4 man crew to complete the entire package including touch up.

Ryn Built Arc
These 23 Homes were completed between 2024-2025 and
ranged from 1600-2600sf each.
These were full interior/exterior painting packages utilizing single product/color/sheen to maximize efficiency. By simplifying the phases into less trips these projects averaged 3-4 days for a 4 man crew to complete the entire package including touch up.
Markham Deer Park
These 16 homes were completed between 2023-2024
and ranged from 1600-2800sf each.
These were full interior/exterior painting packages with white millwork and doors. With the multiple phases these projects averaged 5 days for a 4 man crew to complete the entire package including touch up.
Property Photos
Property Video
Gallery not found.Ryn Built Homes Corbin
These 18 Homes were completed between 2024-2025 and
ranged from 1600-2600sf each.
These were full interior/exterior painting packages utilizing single product/color/sheen to maximize efficiency. By simplifying the phases into less trips these projects averaged 3-4 days for a 4 man crew to complete the entire package including touch up.
Property Photos
Property Video
Gallery not found.Ryn Built Duplexes
These 8 duplexes were completed between 2023-2025
and were from 3400sf each.
These were full interior/exterior painting packages utilizing single product/color/sheen to maximize efficiency. By simplifying the phases into less trips these projects averaged 3-4 days for a 4 man crew to complete the entire package including touch up.
Property Photos
Property Video
Gallery not found.

































